Cedar Spring Estates Water Main Lining
Please note - due to the nature of road construction, inclement weather or other unforeseen circumstances, dates/times may vary. Thanks for your patience as we work to improve our roads.
Updated: March 3, 2026
Start: July 2026
Current Status: Pending
End: September 2026
Description:
The Cedar Spring Estates subdivision has experienced numerous water main breaks over the last decade due to corrosion and deterioration of the existing ductile iron pipe. Instead of a full replacement of the water main, which would involve significant excavation and disturbance to the adjacent lands and roadways, the City will be placing a cured-in-place pipe (CIPP) lining, of approximately 5,000 feet of 8-inch and 600 feet of 12-inch water main. The project will also involve the replacement of existing valves and hydrants. A temporary water service will be provided to the residents prior to and during construction
Traffic Control/Detours:
Depending on the locations of work, which will vary, there may be some minor lane closures, but two-way traffic will be maintained at all times.